A Sawyer company - serving Santa Clarita, CA
A remodeled primary bathroom with a soaking tub and a walk-in shower

Schluter Home Additions & ADU Nationwide

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Santa Clarita
A walk-in shower with large-format tile and a built-in niche
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled hall bathroom with patterned floor tile and painted walls
A low-threshold walk-in shower with a bench and grab bar
A powder room with botanical wallpaper and a stone sink
A second-story addition that matches the existing roofline
A galley kitchen opened up to the dining room with a new peninsula
A remodeled family room with new windows and a window seat
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

Schluter Home Additions & ADU: The Santa Clarita Owner’s Guide

If you’re planning a home addition or ADU in Santa Clarita and want Schluter waterproofing and uncoupling systems spec’d into the build, we install and coordinate the full Schluter line, from KERDI-BOARD to DITRA-HEAT. Home additions in Santa Clarita typically run $45,000 – $130,000, with ADU construction landing between $90,000 – $220,000 depending on foundation work, utility runs, and finish level. Most owners reach out because they’ve had a failed waterproofing job on a previous addition, or they’re tired of contractors who won’t put Schluter specs in writing before demo starts.

Contractor marking a wooden beam with a square for home renovation nationwide

Call (661) 592-1977

Here’s what we hear most: someone built an addition five years ago, the shower pan wasn’t waterproofed correctly, and now there’s water staining the ceiling below. Or the ADU floor tile is cracking because the slab moved and nobody used an uncoupling membrane. Schluter’s whole system exists to prevent exactly those failures, and the difference between a correctly installed Schluter system and a shortcut install shows up within the first two years, every time. In Santa Clarita’s dry heat and occasional heavy winter rains, the expansion and contraction cycle punishes any waterproofing detail that wasn’t done to spec.

Which Schluter Models This Applies To

A remodeled primary bathroom with a soaking tub and walk-in shower

Schluter isn’t a single product, it’s a system. For home additions and ADUs in Santa Clarita, the pieces we spec most often are KERDI-BOARD (the waterproof wall substrate that replaces cement board in wet areas), DITRA and DITRA-XL (the uncoupling membranes that sit between your subfloor and tile), DITRA-HEAT (the same membrane with integrated electric heating cable), and KERDI-BAND (the waterproofing seam tape that ties it all together). Each piece only works correctly when paired with the Schluter products designed for it. DITRA needs KERDI-BAND at every seam. KERDI-BOARD needs KERDI-FIX or KERDI-BAND at every fastener penetration. Skip one detail and the warranty is void, full stop.

OEM versus aftermarket for Schluter is not really a conversation. Schluter does not license their technology to third-party manufacturers. A “Schluter-compatible” membrane from a generic supplier is not tested to the same tolerances and will not carry the Schluter system warranty. When we’re building an ADU in Valencia or a room addition off a home near Old Town Newhall, we use genuine Schluter materials, period. The one place we do make decisions is within the Schluter line itself: DITRA-XL versus standard DITRA depends on whether you need to match an existing floor height, and KERDI-BOARD thickness (1/2″, 5/8″, or 2″) depends on stud spacing and whether the wall is load-bearing.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Signs Your Schluter Home Additions & ADU Is Failing

  • Tile cracks running in a straight line across the floor. This usually means the subfloor moved and there was no uncoupling membrane installed, or the membrane was installed over a slab with cracks that were never addressed. We see this pattern a lot in Santa Clarita ADUs built directly on slab foundations that shift with the seasons.
  • Water staining on the ceiling below a second-story bathroom or shower. Almost always a failed waterproofing detail at the shower pan seam or the curb. By the time the stain is visible, the damage behind the tile is already extensive, so don’t wait.
  • Musty or mildew smell that won’t go away, especially in a newly built ADU. Water is trapped behind the wall assembly. The KERDI-BAND seam or a fastener penetration was missed during install. In Santa Clarita’s dry air, a persistent musty smell in new construction is a red flag, not a quirk.
  • Grout lines cracking or crumbling within a year of installation. Movement in the substrate is telegraphing through the tile. Either the subfloor wasn’t rated for the tile size, or the uncoupling membrane isn’t doing its job because something was installed out of sequence.
  • Electric floor heating (DITRA-HEAT) tripping the breaker or not heating zones consistently. The heating cable was damaged during the membrane install, or the thermostat isn’t reading the floor sensor correctly. This is an electrical concern; don’t go probing at it yourself.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

Home additions in Santa Clarita run $45,000 – $130,000. ADU construction runs $90,000 – $220,000. What drives the range is straightforward: square footage, whether you’re building on a slab or doing foundation work, the distance you need utilities run, and the level of finish. A basic ADU with a standard builder-grade kitchen and bathroom sits at the lower end. An ADU with Cambria or Silestone countertops, KraftMaid cabinetry, higher-end Kohler fixtures, and DITRA-HEAT in the bathroom lands at the upper end.

Here’s what every quote from us includes, in writing, before any work starts:

  • Full Schluter system specification for every wet area, including which products go where and why
  • Line-item pricing for labor and materials separately, so you know exactly what the Schluter components cost versus the install labor
  • A 365-Day Done Right Promise on the work, backed in writing
  • A written price that does not change once the project starts, unless you add scope

We’re not the cheapest option in Santa Clarita, and we’re not going to pretend to be. What we do is put a number in writing and stand behind it. The Schluter warranty on materials comes from Schluter; the workmanship warranty comes from us.

Contractor marking a wooden beam with a square for home renovation nationwide

DIY or Call Us?

If you’re building an ADU from scratch, you can absolutely frame it, run the utilities, and hang drywall yourself. The Schluter waterproofing and uncoupling membrane work is where we tell people to stop. Here’s the honest truth: installing KERDI-BAND correctly requires a specific trowel notch size, a specific thin-set mortar (Schluter ALL-SET, not whatever is on sale at the big box store), and the right amount of pressure to fully embed the fleece. Get any one of those wrong and the waterproofing fails silently. You won’t know until the water damage shows up months or years later.

If you already have an ADU with failing tile or a leaking shower, the DIY window has closed. Removing and replacing failed waterproofing means demoing the tile, assessing the substrate, and rebuilding the system from scratch. That’s not a weekend job. That’s a call to us at (661) 592-1977, and we’ll come out, inspect what’s there, and tell you honestly whether it’s a repair or a full replacement. The estimate is free either way.

FAQs

A freestanding soaking tub in a remodeled primary bathroom

Getting started with Sawyer in Santa Clarita

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Santa Clarita team

A local crew that works across Santa Clarita and the towns around it, to the same written standard as every Sawyer location.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Santa Clarita? Licensed & insured · Free written quotes response · free estimates
Call (661) 592-1977
Local Service Coverage

Request a Free Estimate in Santa Clarita

Tell us what you need - Sawyer Remodel Santa Clarita responds fast. No obligation.

By requesting your free estimate, you agree to our Privacy Policy and authorize us to contact you through phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Us
Call Now - 24/7 Dispatch